Federal Ammunition 300 WIN MAG SP Power-Shok 180gr 20/Box

899,00 kr

Artikelnr: F300WBS

The only tag these loads won’t fill is the price tag. The traditional lead-core hunting bullets in Federal® Power•Shok® rifle loads provide solid accuracy and power at an affordable price. They feature reliable Federal brass, primers and powder and are suited to a wide variety of medium and big game.

Endast 2 kvar i lager

Butik (Vellinge): I lager (2 st)
Webblager: I lager

Svea logo Delbetalning från 105,00 kr/månad

Beskrivning

Beskrivning

The only tag these loads won’t fill is the price tag. The traditional lead-core hunting bullets in Federal® Power•Shok® rifle loads provide solid accuracy and power at an affordable price. They feature reliable Federal brass, primers and powder and are suited to a wide variety of medium and big game.

KALIBER .300 Win Mag

En kaliber som kommer till sin rätt på högvilt och vid jakt på längre avstånd. Något kraftig rekyl som lätt kan justeras med en ljuddämpare. Stort urval av kulor.

Power Shok Rifle

Power-Shok

Traditionell, pålitlig och noggrann jaktkula med blykärna. Kulan har en konsekvent beprövad prestanda till ett överkomligt pris.

Ytterligare information
Vikt0,74 kg
Kaliber300 Win Mag
KulaPower-Shok SP
Kulvikt180 gr / 11.7g
Antal per förpackning20 st
0 m - Utgångshastighet *902 m/s
EAN29465091415
ProduktseriePower-Shok
BC G10.608